On this page
The RESUME SCHEDULES statement can be used to resume paused backup schedules. When a schedule is resumed, the next_run will be set to the next TIMESTAMP that conforms to the schedule.
Required privileges
Only members of the admin role can resume a schedule. By default, the root user belongs to the admin role.
Synopsis
RESUME SCHEDULES <selectclause>
selectclause: select statement returning schedule IDs to resume.
RESUME SCHEDULE <scheduleID>
Parameters
| Parameter | Description |
|---|---|
selectclause |
A selection query that returns id(s) to resume. |
scheduleID |
The id of the schedule you want to resume, which can be found with SHOW SCHEDULES. |
Examples
Pause a schedule
> PAUSE SCHEDULE 589963390487363585;
PAUSE SCHEDULES 1
Resume a single schedule
> RESUME SCHEDULE 589963390487363585;
RESUME SCHEDULES 1
Resume multiple schedules
To resume multiple schedules, nest a SELECT clause that retrieves id(s) inside the RESUME SCHEDULES statement:
> RESUME SCHEDULES SELECT id FROM [SHOW SCHEDULES] WHERE label = 'schedule_database';
RESUME SCHEDULES 4
All schedules with the label schedule_database are resumed.